The Peterson Company

Categories
Municipal

Northview High School Athletic Building

Northview High School Athletic Building

Project Description

We renovated the Northview High School Athletic Building in Brazil, Indiana. All interior CMU walls, lockers, ceilings, and electrical and mechanical systems in the existing locker room sections were removed entirely. Our team then completed an entire build-out, including four new locker rooms featuring metal lockers, new restrooms, showers, and all-new electrical and HVAC systems. In addition, our team also installed a new rooftop unit on the building, rebuilt the wing walls, and painted the floor, walls, and ceiling for the concession stand.

Location

Brazil, IN

Client

Clay County Community School Corporation

Completion Date

Summer 2023

Categories
Industrial

Project Huskies

Project Huskies

Project Description

Peterson constructed Project Huskies, a 543,000 SF build-to-suit in. We completed this project for a confidential client with Shear Property Group! This facility features a 40' clear, three (2) drive-in doors, 35 dock doors, and 200 parking spaces. Our team also fully designed and built the outdoor amenity areas, including irrigation, a 30' flagpole, a fire pit with benches, a pavilion, shelters, a pickle ball, a 2,800 SF putting green, and a fishing dock. In addition, this building has summer ventilation, which will keep the space cool and comfortable during high temperatures.

Location

Greenfield, IN

Completion Date

Fall 2024

Categories
Tenant Improvements

Buffers USA

Project Description

Our team recently wrapped up a fabulous project for Buffers USA in Mooresville, Indiana! Our client purchased a 75,000 SF shell building with only four walls and a roof. Peterson transformed this empty building into a high-end warehouse and office space.

This project included adding two office pods (a main office and a shipping and receiving office), upgrading the warehouse, furnishing and installing all dock equipment, and doing all site work. We also connected all utilities to the building, including the main power, fiber, gas, potable water, 8ā€ fire line, and sanitary

Location

Mooresville, IN

Client

Buffers USA

Completion Date

Winter 2023

Categories
Healthcare

Fast Pace Health – Peru

Fast Pace Health - Peru

Project Description

Our team recently completed another project for Fast Pace Health, a provider of urgent care services. These walk-in clinics are all approximately 3,700 SF and include a reception area, exam rooms, lab area, and x-ray room.

Location

Peru, IN

Client

Fast Pace Health

Completion Date

Winter 2023

Categories
Tenant Improvements

Radial

Project Description

Peterson recently completed a 601,000 SF warehouse/office build-out for Radial Inc. in Avon, Indiana.This project included constructing a full-height demising wall, installing all required electrical infrastructure to support our client's demands throughout the warehouse and office areas, and installing HVAC systems. We also furnished and installed all office finishes, including flooring, paint throughout, roller shades in executive offices and conference rooms, doors and hardware throughout, and glazing in administrative offices and conference rooms. In addition, we cut in (9) new dock positions and installed all appropriate equipment.

Location

Avon, IN

Completion Date

Spring 2023

Categories
Industrial

Brybelly

Project Description

New construction was complete for Brybelly Holdings, a product development and design agency. This 200,000 SF build-to-suit facility features a 32' clear height.

Location

Greenfield, IN

Client

Brybelly Holdings

Completion Date

Winter 2017

Categories
Industrial

Park 133 Bldg. 1

Park 133 Bldg. 1

Project Description

Construction is complete on this 679,000 SF warehouse facility in Whitestown, Indiana. This building features a 32' clear height, two (2) drive-in doors, 12 dock doors, 41 trailer parking spaces, and 126 vehicle parking spaces. In addition, this fantastic location provides direct access to I-65 through the SR 267 interchange.

Developer

Lord Realty

Client

ITS Logistics

Location

Whitestown, IN

Completion Date

Winter 2023

Categories
Industrial

Washington Street Industrial

Washington Street Industrial

Project Description

Construction is complete for Washington Street Industrial, our latest project underway for Patch Development. This 105,000 SF facility features a 32' clear height, two drive-in doors, ten dock doors, and 95 parking spaces.

Location

Indianapolis, IN

Developer

Patch Development

Completion Date

Winter 2023

Categories
Commercial Tenant Improvements

Smitten Kitten

Smitten Kitten

Project Description

Completion of a 2,400 SF build-out for Hamilton County's first-ever cat cafe. This cat lounge offers a safe and cage-free environment with adoptable cats for visitors to interact with.

This renovation included everything from new HVAC equipment and a revised layout to new in-slab plumbing for a new floor plan, new walls and epoxy flooring, and even a glass viewing wall in the cat room.

Location

Fishers, IN

Client

Smitten Kitten

Completion Date

Winter 2023

Categories
Municipal

Clinton Public Library

Clinton Public Library

Project Description

Our team completed this project for the Clinton Public Library. This involved redoing the main entrance, adding an exterior ramp at the south entrance area, adding site pavers to enhance the front of the facility, and new flag poles. We also painted the existing EIFS on the exterior of the library.

Location

Clinton, IN

Client

Clinton Public Library

Completion Date

Fall 2023