The Peterson Company

Categories
Industrial

Park 136

Project Description

Construction is complete on this 62,000 SF speculative warehouse in Brownsburg, IN. Park 136 is located one mile from the I-74 interchange, with convenient access to Crawfordsville Road and Ronald Reagan Parkway. This facility features a 24' clear height, six dock doors, two drive-in doors, and 57 parking spaces.

Location

Brownsburg, IN

Developer

The Atkins Group

Expected Completion

Summer 2023

Categories
Industrial

Decatur Airpark

Decatur Airpark

Project Description

Peterson completed construction on Decatur Airpark, a 80,000 SF Class-A warehouse facility within AmeriPlex Business Park in Indianapolis. This facility features a 28-foot clear height, four (4) drive-in doors, 15 dock doors, 94 parking spaces, and 16 tractor-trailer spaces.

Location

Indianapolis, IN

Developer

The Meritex Company

Completion Date

Winter 2024

Categories
Municipal

Northview High School Athletic Building

Northview High School Athletic Building

Project Description

We renovated the Northview High School Athletic Building in Brazil, Indiana. All interior CMU walls, lockers, ceilings, and electrical and mechanical systems in the existing locker room sections were removed entirely. Our team then completed an entire build-out, including four new locker rooms featuring metal lockers, new restrooms, showers, and all-new electrical and HVAC systems. In addition, our team also installed a new rooftop unit on the building, rebuilt the wing walls, and painted the floor, walls, and ceiling for the concession stand.

Location

Brazil, IN

Client

Clay County Community School Corporation

Completion Date

Summer 2023

Categories
Municipal

LEEAP Center

Project Description

Our team completed this renovation for LEEAP Center in Brazil, Indiana. This project included a complete gut and rebuild of an area to house and relocate the Clay Community School Corporation's IT Department into the new space. The remodel also includes a space for adult education. New metal stud/drywall walls, acoustic ceilings, floors, and electrical and HVAC systems were all installed.

Location

Brazil, IN

Client

Clay County Community School Corporation

Completion Date

Summer 2023

Categories
Tenant Improvements

Imperial Dade

IMPERIAL DADE

Project Description

We completed a 77,000 SF warehouse build-out for Imperial Dade, located inside Ronald Reagan Logistics Park - Building #4 in Brownsburg, Indiana. This space includes a 5,500 SF office space and a 2,000 SF equipment repair/shop area with a dedicated exterior entrance. The renovation included placing HVLS fans and rooftop exhaust fans with interlocking louvers for outside air cooling. We also added a generator for electrical backup.

Location

Brownsburg, IN

Completion Date

Summer 2023